皇冠开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠开户的平台。皇冠开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

Left to right: Kwasi Kwarteng, Secretary of State for Business, Energy and Industrial Strategy, Government of UK; Zainal Abidin Jalil, Executive Director of DNeX and also Managing Director of Ping Petroleum Limited; Datuk Robert Fisher, Director of DNeX and also Chairman of Ping Petroleum Ltd; Tan Sri Syed Zainal Abidin Syed Mohamed Tahir, Group Managing Director of DNeX; and Dan Jackson, Founding Director of Cerulean Winds

KUALA LUMPUR: Dagang Nexchange Bhd's subsidiary Ping Petroleum UK PLC has entered into a memorandum of understanding (MoU) with Cerulean Winds Ltd to explore a collaboration in delivering a dedicated offshore floating wind turbine for the Avalon Development in the Central North Sea, UK.

In a statement, DNeX said the parties plan to establish a joint venture company to deploy and operate the floating wind turbine, which will power the Sevan Hummingbird Floating Production Storage and Offloading (FPSO) vessel acquired by Ping in early July this year.

"Ping aims to connect the FPSO to a dedicated floating offshore wind turbine to power the facility thus minimising diesel and fuel gas usage as well as associated Greenhouse Gas emissions in the UK waters.

"The innovative and pioneering project is set to be one of the first oil and gas production facilities to meet the UK Government’s emissions reduction targets agreed in the North Sea Transition Deal in March 2021," it said.

,

皇冠官方appwww.hg108.vip)是一个开放皇冠官方代理APP下载、皇冠官方会员APP下载、皇冠官方线路APP下载、皇冠官方登录APP下载的官方平台。皇冠体育官方APP上最新登录线路、新2皇冠官方网址更新最快。皇冠体育官方APP开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Ping and Cerulean Winds will also endeavour to reach terms on the power purchase agreement for the Avalon Development with the JV company.

DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said Ping is currently refining its concept to integrate the FPSO with the offshore wind turbine for the Avalon Development, with field development plan approval and final investment decision (FID) targeted for later this year.

“Ping is finalising conceptual development planning after preparing Front End Engineering works to submit the Avalon Field Development Plan.

"In addition, Ping will apply for an innovation licence under the Innovation and Targeted Oil and Gas Decarbonisation (INTOG) licensing from Crown Estate Scotland. The licence would allow us to operate and deploy the dedicated floating offshore wind turbine for the Avalon Development,” he said.

With a total estimated recovery of 23 million barrels of oil, production from the Avalon field is expected to come on stream by mid-2025.


转载说明:本文转载自Sunbet。 usdt收款接口声明:该文看法仅代表作者自己,与本平台无关。转载请注明:皇冠开户:DNeX signs MoU with Cerulean Winds for offshore wind turbine project
发布评论

分享到:

欧博官网登录地址:Cập nhật tình hình bé trai 10 tuổi ở Đồng Tháp rơi xuống trụ bê tông: Chưa thấy uống nước
1 条回复
  1. 澳5彩票开户(www.a55555.net)
    澳5彩票开户(www.a55555.net)
    (2023-01-21 00:12:04) 1#

    “光”800【的核心技术】。充满武侠气息的“光”、暗铁、无剑三大芯片系列,是阿里巴巴未来在人工智能芯片领域的主要结‘构’。这次公布的含“光”800继续刷{新}ai(芯片性能)。“通过测试”,夜“光”800比业内性能最好的ai芯片高4{倍}。作为ai芯片,夜“光”800【的核心技术】无疑是盘算能力。夜“光”800集成了达摩研究所开发<的>算法,【具有】cnn、可视化盘算、「深度优」化盘算等功能。『大大提高』了盘算效率。‘凭据杭州市脑’的盘算能力测试,一【个】“光”800相当于10【个】gpu。现在,都会大脑需要40【个】像素来处置主城区的『交通』《视频》,但现在只需要4【个】800像素,延迟可以削减到150毫秒很6的感觉

发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。